Re: N/A to FI: AFAccord's Modest Turbo Build (attempt)
Timeline:
7 Nov 2011
-Bare block, crank, oil pan dropped off at local race shop for cleaning, boring to 86.5mm, hone, flat decking, straightening, balancing, general inspections.
14 Nov 2011
-Pulled radiator, PS pump, and cam.
-M2S4 Trans...