Well, here's an update: The car is now headed to Alamo Motorsports (Autosports) in Arlington, TX for the completion of the build and the tune of the power FC. They gave me a range of 1-6 months for completion. I'll post updates as I get pictures from them or visit them on a monthly basis.
By completion, I mean power steering, fuel, and oil lines, modifying the exhaust and downpipe, wiring, electronics.
By completion, I mean power steering, fuel, and oil lines, modifying the exhaust and downpipe, wiring, electronics.



